This instruction provides uniform inspection and compliance guidance for Lead Exposure in Construction, 29 CFR 1926.62, Interim Final Rule, published in the Federal Register May 4, 1993, that became effective June 3, 1993.
Also reference CFR 119 - Lead Exposure in Construction: Interim Final Rule, OSHA Technical Manual (TED 01-00-015) and OPN 135, Health Hazards Special Emphasis Program. Additional information and resources can be found on the safety and health topic page for